The action toy company has decided to manufacture a new train set, the production of which is broken into six steps. the demand for the train is units per 40-hour workweek:__________

Respuesta :

Production is the organized activity of transforming resources into finished products in the form of goods and services; the objective of production is to satisfy the demand for such transformed resources”.

‘Subst in equation (1) he various values and obtain the cycle me

-4ohoursx60mintes

4.800unts

| Minutes

Therefore the  in per unit Otis operations 0.5 minutes oF 90 secs,

Cytetime =

Calculate the thecal minimum number of workstation by using the flowing formula

a= shown below

“Theoretical minimum number of work statons= "24st

‘Lifetime

20430415415 +1030

“Theoretical minimum number of work stations= a

4 seasons

Thereforthetheortieal minimum number o stations required ae 4 stations |

1. Make  tasks,

2. Select item heel tasks the task that takes the longest time,

8. When the ole time has been sed up atone stn oF no aks can be assigned to the

feminine time, start a new station

Learn more about Production here

https://brainly.com/question/16755022