Respuesta :

10 WRONG

B and A

Two consecutive points along the PPC is the opportunity cost of DVDs increasing.

What is the opportunity cost of moving from point C to D?

  • The opportunity cost of moving from point C to D is 40 tons of oranges.
  • The per-unit opportunity cost of moving from point C to point D is 1/2 ton of oranges (40 tons of oranges/80 tons of pears). Economic growth is shown by a shift to the right of the production possibilities curve.

What is the opportunity cost of computers?

  • Opportunity cost is a different metric for cost.
  • The amount of wheat that could be produced using the labor required to make one computer, in our example, is the opportunity cost of a computer.
  • Comparative advantage is the capacity to produce a good at a lower opportunity cost than another producer.

To learn more about Opportunity Cost, refer

to https://brainly.com/question/25922327

#SPJ4