The manufacturing cost per vest is $23.20
Direct material average cost = $6 per yard
Average yards per batch = 20
Total direct material cost for 20 yards = 6*20 = $120
Direct material cost for 100 batches = 120*100 = $12000
Direct labour average rate per hour = $12
Average hours per batch = 4 hours
Total direct labour for 4 hours = $12*4 = $48
Direct labour cost for 100 batches = $48*100 = $4800
Variable overhead average rate per hour = $8
So, total variable overhead average rate = $8*4*100 = $3200
Monthly fixed cost = $3200
Selling and administrative cost = $1900
No. of batches produced = 100
Number of vests in each batch = 10
Total vests produced = 1000
Total cost = Direct material cost + Direct labour cost + Variable overhead cost + Fixed cost
= $12000 + $4800 + $3200 + $3200
= $23200
So, cost per vest = $23200/1000 = $23.20