When work will be performed on a construction site that contains underground utility lines, the lines should be located and identified. To do this, a site marking visit will have to be arranged at least _______ in advance.

A. 12 hours
B. 48 hours
C. 4 days
D. 24 hours

Respuesta :

12 hrs to 24 hrs in an advance

hope this helps :)

ANSWER:

When work will be performed on a construction site that contains underground utility lines, the lines should be located and identified. To do this, a site marking visit will have to be arranged at least 12H to 24h in advance.

~batmans wife dun dun dun......