in a paint factory, an old converyor line has filled 33 barrels of paint, and is filling more at a rate of 5 barrels per minute. a worker just switched on a newer line that can fill 6 barrels per minute. in a little while, the two lines will have filled an equal number of barrels. how many barrels will each line have filled? how long will that take?