Assume that we have seeded a program with 5 defects before testing. After the test, 20 defects were detected, of which, 2 are from the seeded defects and 18 are real, non-seeded defects. We know there are 3 more seeded defects remaining in the software. Assuming a linear relationship, what is the estimated real, non-seeded defects that may still be remaining in the program