Please review example below and indicate what is wrong with the bucket. (2 points)

Output • S Output 01/02/2019 CURS PODE 109,316,00 1265013000 135,28,000.00 18,517,00.00 4,04,000 125,738,000 15,424,0.00 147.540,000

Output · S Output 01/02/2019 CURS 100E 109,314,000 126,013,000.00 125,28,000.00 18,517,000 46,04,000 125,788,00.00 135,424,00 147,540,000

Output : 5 Output - 01/02/2019 CURA PODE -109,316,00 -26,013,000.00 -15.20,000.00 184,517,00.00 49,04,000 -125,758,00 -135,424,000.00 - 149,500.00

A) A sign should be flipped

B) A label is incorrect

C) Scaling is incorrect

D) A value label is incorrect