Disaggregation breaks the aggregate plan into greater detail. The result of the process is called disaggregate module.
A higher-level plan is broken down into lower-level, more specific plans and schedules through the manufacturing planning and control (MPC) process. Usually too broad and therefore lacking, the high level plan. Detailed operational schedules must be used to complement it and put into action.
In order to identify patterns that may be hidden by larger, aggregate data, disaggregating data is crucial. Subpopulations can be specifically examined to ensure that resources are allocated to the areas and students where they are most needed and likely to have the greatest impact.
Focused operational plans can be made through disaggregation. It involves dissecting a larger operation into more manageable plans with shorter time frames.